<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/xsl" href="style/detail_T.xsl"?>
<bibitem type="C">   <ARLID>0382158</ARLID> <utime>20240103201402.9</utime><mtime>20121031235959.9</mtime>   <WOS>000316715900054</WOS>         <title language="eng" primary="1">Convexity in stochastic programming model with  indicators of ecological stability</title>  <specification> <page_count>6 s.</page_count> <media_type>P</media_type> </specification>    <serial><ARLID>cav_un_epca*0380980</ARLID><ISBN>978-80-7248-779-0</ISBN><title>Proceedings of 30th International Conference Mathematical Methods in Economics</title><part_num/><part_title/><page_num>314-319</page_num><publisher><place>Karviná</place><name>Silesian University in Opava, School of Business Administration in Karviná</name><year>2012</year></publisher><editor><name1>Ramík</name1><name2>Jaroslav</name2></editor><editor><name1>Stavárek</name1><name2>Daniel</name2></editor></serial>    <keyword>stochastic programming</keyword>   <keyword>convexity</keyword>   <keyword>value-at-risk models</keyword>    <author primary="1"> <ARLID>cav_un_auth*0108104</ARLID> <name1>Houda</name1> <name2>Michal</name2> <full_dept language="cz">Ekonometrie</full_dept> <full_dept language="eng">Department of Econometrics</full_dept> <department language="cz">E</department> <department language="eng">E</department> <institution>UTIA-B</institution> <full_dept>Department of Econometrics</full_dept>  <fullinstit>Ústav teorie informace a automatizace AV ČR, v. v. i.</fullinstit> </author>   <source> <url>http://library.utia.cas.cz/separaty/2012/E/houda-convexity in stochastic programming model with  indicators of ecological stability.pdf</url> </source>        <cas_special> <project> <project_id>GAP402/10/0956</project_id> <agency>GA ČR</agency> <ARLID>cav_un_auth*0263482</ARLID> </project>  <abstract language="eng" primary="1">We develop an optimization model dealing with construction expenses that are prescribed as a result of the EIA (Environmental Impact Assessment) process. The process is an obligatory part of every large construction  project and evaluates possible influences of the project to the environment, including population health, natural and other socio-economic aspects; the result of the process is a set of recommendation and arrangements the construction must meet.    Our optimization model incorporates uncertainties in model parameters; we  represent them through their probabilistic distribution. Furthermore, to overcome a problem with quantifying subjective utility function of ecological impacts, we measure them by so-called indicators of ecological stability. The resulting problem is stochastic programming problem formulated as (C)VaR model used traditionally in finance area. In our contribution we deal with convexity properties of this problem – these are especially important from the  theoretical as well as from the computational point of view.</abstract>  <action target="CST"> <ARLID>cav_un_auth*0283511</ARLID> <name>30th International Conference Mathematical Methods in Economics 2012</name>  <place>Karviná</place> <dates>11.09.2012-13.09.2012</dates>  <country>CZ</country> </action>    <reportyear>2013</reportyear>  <RIV>BB</RIV>      <num_of_auth>1</num_of_auth>  <presentation_type> PR </presentation_type> <inst_support> RVO:67985556 </inst_support>  <permalink>http://hdl.handle.net/11104/0212459</permalink>        <arlyear>2012</arlyear>       <unknown tag="mrcbU34"> 000316715900054 WOS </unknown> <unknown tag="mrcbU63"> cav_un_epca*0380980 Proceedings of 30th International Conference Mathematical Methods in Economics 978-80-7248-779-0 314 319 Karviná Silesian University in Opava, School of Business Administration in Karviná 2012 </unknown> <unknown tag="mrcbU67"> Ramík Jaroslav 340 </unknown> <unknown tag="mrcbU67"> Stavárek Daniel 340 </unknown> </cas_special> </bibitem>